Whitworth Locke
![](https://static.wixstatic.com/media/12ddd3_b4a5de9c8283404a801cc8722dc37c22~mv2.png/v1/fill/w_325,h_205,al_c,lg_1,q_85,enc_auto/12ddd3_b4a5de9c8283404a801cc8722dc37c22~mv2.png)
![](https://static.wixstatic.com/media/12ddd3_de68ad116449424684aa6cc11bdaeecd~mv2.jpg/v1/fill/w_271,h_174,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/12ddd3_de68ad116449424684aa6cc11bdaeecd~mv2.jpg)
![](https://static.wixstatic.com/media/12ddd3_07028a2423e149a0b79dd2456ea25578~mv2.jpg/v1/fill/w_271,h_170,al_c,lg_1,q_80,enc_auto/12ddd3_07028a2423e149a0b79dd2456ea25578~mv2.jpg)
Client | Sector | No. of Beds | No. of Storeys | Architect | Structural Engineer | Main Contractor | Mechanical Contractor | Electrical Contractor |
---|---|---|---|---|---|---|---|---|
SACO Group | Hospitality | 160 | 6 | LRW | N/A | Phelan Construction | Tideside | DES |
Conversion of outdated 116 serviced apartments into 160 Locke Aparthotel units together with an open plan bar, co working area, a gym and independent food retail unit. Development includes conversion of an existing derelict Spa area within the Grade II listed building into additional commercial units
Services Highlights:
-
Detailed feasibility/condition surveys allowing for utilising as much of the existing services as possible
-
Complex planning application with meeting onerous planning requirements and direct engagement with the Local Planning Authority
-
Complete pre-tender MEP design inclusive of ventilation/air conditioning/public health/lighting