Packing Hall 4 and 5 Implementation

Client
Sector
No. of Beds
No. of Storeys
Architect
Structural Engineer
Main Contractor
Mechanical Contractor
Electrical Contractor
TEVA UK LTD
Industrial
N/A
1

Applied Energy was commissioned to survey and investigate the existing air handling plant serving Packing Halls 4 and 5 to resolve issues of poor ventilation and humidity control.

Services Highlights:

  • Updating of record drawings to match current installed arrangement.

  • Air flow tests of the entire system

  • Recommissioning of the chilled water services

  • Detailed review of potential for including dehumidifies to closely control humidity levels within the packing halls.