top of page
hub Westminster, London
Client | Sector | No. of Beds | No. of Storeys | Architect | Structural Engineer | Main Contractor | Mechanical Contractor | Electrical Contractor |
---|---|---|---|---|---|---|---|---|
Whitbread | Hospitality | 137 | 8 | Axiom Architects | Simpson Associates | Gilbert Ash | Sharpe Mechanical Services | John Dawson Electrical |
Conversion of an existing 8 storey office building into a 137 bed hub by Premier Inn hotel.
Services highlights:
-
Due diligence site survey
-
Planning support including thermal modelling and energy strategy report
-
Complete scheme design of all building services (heating/cooling, ventilation, domestic water services, public health, power, lighting, fire detection and data services)
-
Review and monitoring of contractor design and installation
-
Building incorporated Combined Heat and Power with large thermal storage to generate proportion of the site’s hot water demands
-
Inclusion of high efficiency air source heat pumps with heat recovery
-
BREEAM Excellent Completion Certification
bottom of page