top of page

hub by Premier Inn Westminster Abbey, London

Client
Sector
No. of Beds
No. of Storeys
Architect
Structural Engineer
Main Contractor
Mechanical Contractor
Electrical Contractor
Whitbread
Hospitality
339
8
Axiom Architects
Simpson Associates
Gilbert Ash
Sharpe Mechanical Services
John Dawson Electrical

Conversion and extension of an existing 8 storey office building into a 339 bed hub by Premier Inn hotel. The scheme involved the creation of a mezzanine level of bedrooms within the existing building and achieved a BREEAM Excellent rating.

Services highlights:

  • Due diligence site survey

  • Planning support including thermal modelling and energy strategy report

  • Complete scheme design of all building services (heating/cooling, ventilation, domestic water services, public health, power, lighting, fire detection and data services)

  • Review and monitoring of contractor design and installation 

  • Building incorporated Combined Heat and Power with large thermal storage to generate proportion of the site’s hot water demands

  • Inclusion of high efficiency air source heat pumps with heat recovery

  • BREEAM Excellent Completion Certification

bottom of page