top of page
Darwin Centre Phase II Fit Out
![](https://static.wixstatic.com/media/ab07f3_27e971dc927640a982282f74bae543b0~mv2.jpg/v1/fill/w_583,h_368,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/ab07f3_27e971dc927640a982282f74bae543b0~mv2.jpg)
![](https://static.wixstatic.com/media/ab07f3_2d8724d6040b4f3e977c63424825486d~mv2_d_2048_1536_s_2.jpg/v1/fill/w_271,h_174,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/ab07f3_2d8724d6040b4f3e977c63424825486d~mv2_d_2048_1536_s_2.jpg)
![](https://static.wixstatic.com/media/ab07f3_a34c974bf3f840d9956a1b6e7b826dae~mv2_d_2048_1536_s_2.jpg/v1/fill/w_271,h_170,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/ab07f3_a34c974bf3f840d9956a1b6e7b826dae~mv2_d_2048_1536_s_2.jpg)
Client | Sector | No. of Beds | No. of Storeys | Architect | Structural Engineer | Main Contractor | Mechanical Contractor | Electrical Contractor |
---|---|---|---|---|---|---|---|---|
Natural History Museum | Museums & Historic Buildings | N/A | 8 | CF Moller | N/A | Beck Interiors | GW Franklin | SI Electrical |
The second phase of the Darwin Centre was an extension of the famous Natural History Museum, and took the form of an eight-storey concrete cocoon, surrounded by a glass atrium. We were involved with the fit out of the space.
Services highlights:
-
Design of MEP services for the fit out of the Darwin Centre
-
Construction monitoring
-
Commissioning support
bottom of page