Redcliff Quarter Phase 1



The development forms the first phase of the regeneration of the Redcliff area in Bristol and consists of two ‘n’ shaped residential blocks, located over a shared ground floor and covered car park with retail units on both St. Thomas Street and Redcliff Street.
Services highlights:
-
Planning support including SAP calculations and thermal modelling
-
Energy strategy and Solar PV report
-
Planning achieved with electric heating
-
Complete scheme design of all building services (heating/cooling, ventilation, domestic water services, public health, power, lighting, fire detection and data services)
-
Building incorporated solar PV arrays
-
Comfort cooling with air source heat pumps to duplex and penthouse apartments